Dallas High Five Segmental Ramps

Dallas High Five Segmental Ramps
Resource Types
Case History
Bridge Case Histories,
Faster construction and the ability to minimize impacts to traffic were key goals for the construction of concrete segmental ramps on the Dallas High Five project, which consisted of five ramps with span lengths up to 300 ft long.