Home / DAVIS SLOUGH BRIDGE, SR 532

DAVIS SLOUGH BRIDGE, SR 532

Stanwood and Camano Island, WA

PROJECT DETAILS

  • Design Criteria:
    • Replace older structure and provide increased deck clearance.
    • Improve structural safety during earthquakes.
    • Increase deck width to accommodate disabled vehicles and emergency responders.
  • Owner: Washington State DOT
  • Designer: Parsons/Kuney JV (Joint Venture)
  • Total Project Cost: $54 million
  • Total Project Size: LENGTH: 400 ft WIDTH: 56 ft
  • Year Completed: 2010

The original Davis Slough highway and bridge was built in the 1950s and spans the mount of the Stillaguamish River and a railroad spur line. It is the only bridge to Camano Island.

The replacement 400-ft long 3-span bridge meets current earthquake standards, requires less maintenance, and provides wide shoulders to accommodate disabled vehicles and emergency responders. The new bridge was built with precast concrete girders and a cast-in-place concrete deck containing epoxy-coated reinforcing steel. The 190-ft main span represents one of the longest precast, prestressed girder spans in the Pacific Northwest.

The new bridge is designed to withstand a 1,000-year seismic event without collapsing, despite deep onsite alluvial fills that have a high potential for liquefaction during a significant earthquake. Impacts to the surrounding estuarine wetlands and streams were also minimized during construction.